书签 分享 收藏 举报 版权申诉 / 3
1

类型[20150930]IF10295_填海局建筑成本加速还款.pdf

  • 上传人:任**
  • 文档编号:25274
  • 上传时间:2022-06-24
  • 发布时间:2019-06-25
  • 格式:PDF
  • 页数:3
  • 大小:434.09KB
  • https:/crsreports.congress.gov September 30, 2015Accelerated Repayment of Bureau of Reclamation Construction CostsTitle IX of H.R. 2898, the Western Water and American Food Security Act of 2015, includes provisions that would potentially alter construction repayment for Bureau of Reclamation (Reclamation) projects. The potential changes are discussed below. Background Since the passage of the Reclamation Act of 1902, reclamation law has been based on the concept of project repaymentreimbursement of federal construction costsby project water and power users. Agreements between the federal government (through Reclamation) and water users for delivering water are generally governed by one of two contract types: water service contracts or repayment contracts. There are 860 such contracts currently in effect in the 17 western states. The terms of repayment and water service contracts differ. Repayment contracts are generally made for terms of 40 years, with capital costs amortized over the long-term period and repaid in annual installments (without interest for irrigation investments and with interest for municipal and industrial M&I investments). Costs are repaid annually in fixed amo
    展开阅读全文
    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    20150930 IF10295_ 填海局 建筑 成本 加速 还款
    1
    提示  联参智库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
    关于本文
    本文标题:[20150930]IF10295_填海局建筑成本加速还款.pdf
    链接地址:https://www.lianhezuozhan.com/doc/25274.html
    1

    客服:010-66465788   北京联参科技有限公司版权所有  工业和信息化部备案/许可证编号:京ICP备2022007273号-1



    联参智库