[20180910]IN10889_陆军期货司令部(AFC).pdf
CRS INSIGHT Prepared for Members and Committees of Congress InsightInsight Army Futures Command (AFC) Andrew Feickert Specialist in Military Ground Forces Updated September 10, 2018 The Issue The Armys post-Cold War development of major combat systems has been characterized by a number of high-profile program cancellations, such as Crusader, an artillery system cancelled in 2002 after having spent $2.2 billion; Comanche, a helicopter program cancelled in 2004 after having spent $7.9 billion; and the Future Combat System (FCS), cancelled in 2009 after having spent $18.1 billion. In addition to the expenditure of resources, these cancellations have impeded the development of newer, more capable systems, permitting potential adversaries to achieve battlefield parity and, in some cases, superiority over U.S. ground combat systems. The Army describes the issue as follows: The Armys current requirements and capabilities development practices take too long. On average, the Army takes from 3 to 5 years to approve requirements and another 10 years to design, build, and test new weapon systems. The Army is losing near-peer competitive advantage in many areas: we are outranged, outgunned, and
展开阅读全文
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 20180910 IN10889_ 陆军 期货 司令部 AFC

关于本文